Proven Results

Case Studies from High-Mix, High-Precision Production

From camera module alignment to battery pack assembly, our teams deliver measurable gains in throughput, quality, and flexibility for global manufacturers.

37%

Average cycle-time reduction after line upgrade

99.6%

Typical first-pass yield on stabilized projects

21

Countries served across 3C and adjacent sectors

< 8 weeks

Fast-track deployment for modular stations

Featured Projects

Selected Implementations

Each case combines mechanical design, control architecture, vision, and process validation tailored to customer goals.

Smartphone Vision-Guided Assembly

Camera Module Auto-Alignment Line

Built a 12-station automated line for flagship smartphone camera modules with active alignment, UV curing, and in-line MTF testing.

  • Challenge: Tight optical tolerance with frequent model switches
  • Solution: Sub-micron motion platform + recipe-driven quick changeovers
  • Outcome: 42% faster takt time, 99.4% alignment pass rate
Wearables Laser + AOI

Smartwatch Back-Cover Bonding Cell

Delivered a compact robotic cell integrating dispensing, plasma cleaning, laser marking, and 360° automated optical inspection.

  • Challenge: Cosmetic defects at adhesive boundary
  • Solution: Closed-loop dispensing profile with real-time viscosity compensation
  • Outcome: Defect rate reduced by 63%, traceability at unit level
Battery Pack Assembly

Consumer Device Battery Pack Line

Designed a semi-to-full automation roadmap for cylindrical cell sorting, welding, leak check, and end-of-line electrical verification.

  • Challenge: Manual bottlenecks and inconsistent weld quality
  • Solution: Modular indexing platforms with integrated SPC dashboard
  • Outcome: 2.1x output, Cpk improved to 1.67 on key weld metrics
Tablet Functional Test

Multi-Variant End-of-Line Test Platform

Created a programmable test architecture supporting screen, audio, wireless, and sensor checks across five product families.

  • Challenge: Long test scripts slowed delivery windows
  • Solution: Parallelized test sequencing with auto-skip logic by SKU
  • Outcome: 31% reduction in test time, 100% digital test records
Accessories Flexible Manufacturing

USB-C Cable Connector Assembly Upgrade

Re-engineered a legacy line into a flexible platform that handles connector variants, braiding options, and packaging formats.

  • Challenge: High SKU count with small batch orders
  • Solution: Tool-less fixtures and barcode-driven recipe switching
  • Outcome: Changeover under 9 minutes, 27% labor reduction
Medical Electronics Cleanroom Automation

Precision Sensor Sub-Assembly in ISO 7 Environment

Implemented cleanroom-compatible automation for delicate sensor assembly, integrating force-controlled insertion and particle monitoring.

  • Challenge: Scrap caused by micro-deformation during insertion
  • Solution: Servo press with adaptive force curves and anomaly detection
  • Outcome: Yield rose from 94.8% to 99.1% within six weeks

Delivery Method

How We Execute Projects

  1. Discovery: Process mapping, constraints review, and ROI modeling
  2. Concept Validation: Feasibility rigs, fixture prototyping, and DFMA checks
  3. Build & Integration: Mechanical fabrication, controls, MES/ERP data interfaces
  4. Ramp-Up: FAT/SAT, operator training, and performance stabilization

Next Case Could Be Yours

Need a custom line for your next product launch?

Share your cycle-time target, product variants, and quality requirements. We will propose a practical automation roadmap.